48V 200Ah LiFePO4 Battery Pack
LiFePO4 Battery Parameter Table
| Description | Dimensions (L*W*H) | Packaging Information |
| Rated Energy: 10240Wh Cell: Prismatic LiFePO4, RS485, CAN Terminal: M8 Configuration (Customizable): 16S1P, 16S2P Nominal Voltage & Capacity: 48V, 200Ah Max Charging Current: 200A Instantaneous Discharge Current: 400A Continuous Discharge Current: 200A Cycle Life: 6000 cycles Water & Dust Resistance: IP65 Charging Temperature: 0~45°C Discharge Temperature: -20~60°C Storage Temperature: -20~65 °C Operating Voltage Range: 40-58.4V Over-Charge Protection Voltage: 58.4V ± 0.2V Over-Discharge Protection Voltage: 40V ± 0.2V Battery Protection Temperature: 60°C ± 5°C | 650*360*260mm | Unit N.W.: Appr. 65kg Packing Qty: 1pc/ctn CTN Size: 720x410x305mm Outer CTN N.W.: 65kg Outer CTN G.W.: 66kg |
Not sure who to contact?
Message us on WhatsApp with the capacity you need, the quantity and the destination market. You will get the right configuration and a price, usually within the hour. You can also email sales@beeste.com — we reply within 24 hours.
WhatsApp +86 198 7641 4034WhatsApp +86 186 2035 9117Get a Quote
What a 10kWh block changes
10,240Wh in a single 48V unit covers whole-home backup for a day, or two days of essentials. It is the size where one pack replaces a rack of smaller units and removes most of the wiring.
Who it suits
Whole-home backup and high-capacity industrial storage. Typically specified by installers designing a system around a single inverter rather than by end users buying a component.
Before you order
- Handling and installation access decide whether this is viable on a given site. Confirm dimensions and weight before quoting.
- The RS485 and CAN interfaces support real-time diagnostics. Confirm what the inverter can actually read.
- Transport of a 10kWh pack is a dangerous goods shipment. Confirm documentation against the exact configuration.
Listing note
A 10kWh block is an installation decision, not a component purchase. Confirm site access, floor loading and lifting provision before the order is accepted, because those are what delay a project after the invoice.
Related reading
- portable power station certifications — the certification set buyers check before ordering.
- portable power station manufacturer — a 12-point checklist for verifying a factory.